Laserfiche WebLink
EXHIBIT F - Reclamation Plan Map <br />The reclamation map shows the following items: <br />a) The anticipated physical appearance of the area, correlated to the proposed mining <br />areas and reclamation timetables. It also includes contour lines that portray the <br />direction and rate of slope of all reclaimed lands. <br />b) The map also indicates the final land use after reclamation. <br />EXHIBIT G - Water Information <br />The excavation will occur in an ox bow lying south of the normally dry Frenchman Creek that <br />does run when there is heavy rainfall in the area. There are no water structures on or adjacent to <br />the site. This project will not have any water requirements for its operation. Aside from rainfall <br />runoff, the excavation should not encounter any water during mining. The only water that <br />affects the site would be runoff from heavy rainfall. Rainfall in the area averages about 17.8 <br />inches per year. The site will generally not be impacted by water. The water table in the area is <br />substantially below the surface, in most cases at least 50 feet deep. <br />