My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-04_REPORT - M1981044
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1981044
>
2013-04-04_REPORT - M1981044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 3:50:29 PM
Creation date
4/8/2013 7:54:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981044
IBM Index Class Name
REPORT
Doc Date
4/4/2013
From
Solberg Gravel LLC
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Total acres <br />Solberg Gravel LLC <br />Total acres <br />M- 1981 -044 <br />Total acres <br />Solberg Pit <br />Total acres <br />El Paso <br />backfilled: <br />27,$' <br />seeded w/ <br />O <br />w /topsoil <br />O <br />mulched w/ <br />D <br />approved mix: <br />replaced: <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />n , <br />Mulch application <br />graded: <br />27, / 3 <br />fertilized w/ <br />apvd fertilizer: <br />///14- <br />replacement <br />depth (in.): <br />y -te <br />rate (tons /ac): <br />/Il- <br />Seed <br />Fertilizer <br />Mulch <br />application <br />yI /4- <br />application <br />N III- <br />application <br />h I <br />method: <br />method: <br />method: <br />Pernittee Name: <br />Solberg Gravel LLC <br />Permit Number: <br />M- 1981 -044 <br />Operation Name: <br />Solberg Pit <br />County: <br />El Paso <br />Annual Fee Due: <br />$791.00 <br />Anniversary Date: <br />April 7, 2013 <br />Permit Acreage: <br />234.56 <br />Current Bond Amt: <br />$72,635.00 <br />1. <br />1 l . Estimated acre <br />s to be reclaimed to the next report year. <br />112c Annual Report <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of erment disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES <br />If "YES," please note time limits related to completion of reclamation. Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />5. Does the mine operate more than 180 days per year? <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. I-las this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />8. Number of acres that were newly affected during the current report yeik <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />Dlvlsion of Reclamation, <br />Mining & Safety <br />ECEIVED <br />APR 0 4 2013 <br />12. Total acres in various stages of reclamation, since permitted mining activities began <br />y /zfi3 <br />7,18 <br />t. Z3 <br />O <br />5.4-ty* <br />6.23 <br />Pale 2 of 3 <br />0 <br />NO <br />YES NO <br />NO <br />
The URL can be used to link to this page
Your browser does not support the video tag.