My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-03_GENERAL DOCUMENTS - C1996083
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1996083
>
2013-04-03_GENERAL DOCUMENTS - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:06 PM
Creation date
4/8/2013 7:47:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
General Documents
Doc Date
4/3/2013
Doc Name
Proposed Decision and Findings (PR13)
From
DRMS
To
Bowie Resources, LLC
Permit Index Doc Type
Findings
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I . Alternative criteria and specifications were not used during the design of <br />haul roads (4.03.1(1)(e)). <br />2. The Division approved the retention of a portion of the haul road depicted <br />on Map No. 18, since it is compatible with the approved post- mining land <br />use, and a request for its retention was submitted by the landowner <br />(4.03. 1 (1)(f)(i)). <br />3. The Division does not propose to approve the location of a portion of the <br />haul road in the channel of an ephemeral stream draining a watershed of at <br />least one (1) square mile, an intermittent or perennial stream <br />(4.03.1(2)(b)). <br />4. The Division approved haul road encroachment into an ephemeral stream <br />with a watershed less than one (1) square mile during the construction <br />period, since it did not alter normal water flow, contribute sediment, or <br />adversely affect fish or wildlife (4.03.1(2)(c)). <br />5. The Division does not propose to approve haul road cut slopes steeper <br />than 1.5H:1 V in unconsolidated materials or 0.25H:1 V in rock <br />(4.03.1(3)(c)(i)). <br />B. Access Roads <br />One access road was built to provide access from the portal bench to the utility <br />bench above the portal bench. Several short length access roads were built that <br />lead from the main paved haul road to important points along the utility corridor, <br />for access to the conveyor line, water line and high voltage power line. There is <br />also an access road south of the unit train loadout. <br />1. Alternative criteria and specifications were not used during the design of <br />access roads (4.03.2(1)(e)). <br />2. The landowner has not requested the retention of the access road depicted <br />on Map Nos. 15 -1 and 15 -2. Therefore, the access road will be reclaimed <br />(4.03.2(1)(f)). <br />3. The Division does not propose to approve the location of a portion of an <br />access road in the channel of a stream (4.03.2(2)(b)). <br />4. The Division does not propose to approve access road cut slopes steeper <br />than 1.5H:1 V or 0.25H:1 V (4.03.2(3)(c)(i)). <br />5. The Division does not propose to approve an access road embankment <br />slope steeper than 1.35H: IV (4.03.2(3)(d)(viii)). <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.