Laserfiche WebLink
BLASTING MATERIALS QUANTITIES <br />HOURLY EQUIPMENT COST <br />inti <br />Shift basis: 1 per day <br />Drilling Equipment - Drill: ATLAS COPCO ROC L6,6.0 in. <br />-Drill Pad Preparation: NA <br />Misc. Drill Support Equipment: NA <br />Misc. Explosives Support Equipment: NA <br />Explosives Delivery —Bulk Truck: ANFO Bulk Delivery Truck <br />-Cap Truck: NA <br />Drilling Drill Pad Misc. Drill Misc. Expl. Explosives Delivery <br />Cost Breakdown: Eauinment Preparation Sunnort Sunnort Bulk Truck Can Truck <br />QUANTITY <br />UNIT <br />Total Quantity of Stemming Required: <br />9.98 <br />cubic yards <br />Total Quantity of Explosives Required: <br />16,827 <br />pounds <br />Total Quantity of det. cord /fuse /wire Required: <br />8,796 <br />linear feet <br />Quantity of Blasting Caps per Blasthole: <br />I <br />cap(s) <br />Total Quantity of Blasting Caps Required: <br />332 <br />caps <br />Quantity of Primers per Blasthole: <br />1 <br />primer(s) <br />Total Quantity of Primers Required: <br />332 <br />primers <br />Quantity of Delays per Blasthole: <br />1 <br />delay(s) <br />Total Quantity of Delays Required: <br />334 <br />delays <br />HOURLY EQUIPMENT COST <br />inti <br />Shift basis: 1 per day <br />Drilling Equipment - Drill: ATLAS COPCO ROC L6,6.0 in. <br />-Drill Pad Preparation: NA <br />Misc. Drill Support Equipment: NA <br />Misc. Explosives Support Equipment: NA <br />Explosives Delivery —Bulk Truck: ANFO Bulk Delivery Truck <br />-Cap Truck: NA <br />Drilling Drill Pad Misc. Drill Misc. Expl. Explosives Delivery <br />Cost Breakdown: Eauinment Preparation Sunnort Sunnort Bulk Truck Can Truck <br />Total work team cost /hour: $309.10 <br />MATERIALS COST <br />Drilling <br />Unit <br />Unit Cost <br />Quantity <br />MiscTruck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />15 <br />NA <br />Ownership cost /hour: <br />$50.03 <br />NA <br />NA <br />NA <br />$67.53 <br />NA <br />Operating cost/hour: <br />$116.31 <br />NA <br />NA <br />NA <br />$12.52 <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />NA <br />Operator cost/hour: <br />$39.69 <br />NA <br />NA <br />NA <br />$23.02 <br />NA <br />Unit Subtotals: <br />$206.03 <br />$0.00 <br />$0.00 <br />$0.00 <br />$103.07 <br />$0.00 <br />Number of Units: <br />1 <br />0 <br />0 <br />0 <br />1 <br />0 <br />Group Subtotals: <br />$206.03 <br />$0.00 <br />$0.00 <br />$0.00 <br />$103.07 <br />$0.00 <br />Total work team cost /hour: $309.10 <br />MATERIALS COST <br />Total Materials Cost: $10,625.35 <br />Description <br />Unit <br />Unit Cost <br />Quantity <br />Total Cost <br />Bulk ANFO nom. density <br />Blasting Agent: <br />( 7,900- 15,000 fps) <br />Pound <br />$0.234 <br />16827.481 <br />$3,937.63 <br />Cast primer, 0.3 lb <br />(electric or non - electric <br />Primers or Boosters: <br />system) <br />Each <br />$2.885 <br />332.000 <br />$957.82 <br />Non - electric cap, delay <br />Blasting Caps: <br />(non - electric systems) <br />Each <br />$3.489 <br />332.000 <br />$1,158.35 <br />Det. Cord, fuse, or <br />Detonating cord, 10 gr. /ft. <br />wire: <br />(non - electric systems) <br />Linear foot <br />$0.119 <br />8795.600 <br />$1,046.68 <br />MS connectors (non- <br />Delays: <br />electric systems) <br />Each <br />$4.914 <br />334.000 <br />$1,641.28 <br />Miscellaneous: <br />0.000 <br />$0.00 <br />Drill bits: <br />Bit life = 2,600 <br />Linear feet <br />$1,639.00 <br />1.149 <br />$1,883.59 <br />Total Materials Cost: $10,625.35 <br />