Laserfiche WebLink
Task description: <br />Site: New Horizon Mine <br />BULLDOZER WORK <br />Pond 009 <br />Permit Action: Permit Renewal 6 <br />PROJECT IDENTIFICATION <br />Task #: 051 State <br />Date: 12/18/2012 County <br />User: SLB <br />Colorado <br />Montrose <br />Page 63 of 149 <br />Permit /Job #: C1981008 <br />Abbreviation: None <br />Filename: C008 -051 <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />HOURLY EQL <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />IPMENT COST <br />Cat D9T - 9SU <br />405 <br />Semi - Universal <br />NA <br />1 per day <br />(CRG) <br />factor <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly 1,243.2 LCY/hr <br />production: <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: 0% <br />Average site altitude: 5,700 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />CIRCES Cost Estimating Sofiivare <br />Utilization % <br />Ownership Cost /Hour: <br />$69.88 <br />NA <br />Operating Cost/Hour: <br />$142.13 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost /Hour: $249.42 <br />Total Fleet Cost /Hour: $249.42 <br />MATERIAL QUANTITIES <br />Initial Volume: 8,861 <br />Swell factor: 1.165 <br />Loose volume: 10,323 LCY <br />Source of estimated volume: <br />Operator Task 013 <br />Source of estimated swell <br />Cat Handbook <br />factor <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly 1,243.2 LCY/hr <br />production: <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: 0% <br />Average site altitude: 5,700 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />CIRCES Cost Estimating Sofiivare <br />