My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-05_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2013-04-05_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:12 PM
Creation date
4/5/2013 12:46:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
4/5/2013
Doc Name
Cost Estimate
From
Susan Burgmaier
To
Marcia Talvitie
Type & Sequence
RN6
Email Name
SLB
SB1
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71d <br />75b <br />76b <br />76c <br />Yr 6 <br />Total = <br />1 <br />1 <br />1 <br />1 <br />Performance bond: <br />$34,429.39 <br />$16,770.20 <br />$7,539.29 <br />$3,394.33 <br />Drill seed Irrigated CR - No Release - ASG Seed <br />Yr 6 <br />REVEGE <br />111.92 <br />Mobilize smaller equipment for initial reclamation <br />MOBILIZE <br />11.77 <br />Mobilize equip. for ponds and ditches - no <br />breakdown <br />MOBILIZE <br />11.77 <br />Mobilize grader annually ten times for site <br />maintenance <br />MOBILIZE <br />2.80 <br />SUBTOTALS: <br />6355.06 <br />54,555,074.54 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02% <br />Total = <br />$92,012.51 <br />Performance bond: <br />1.05% <br />Total = <br />$47,828.28 <br />Job superintendent: <br />1,843.49 hrs <br />Total = <br />$120,582.68 <br />Profit: <br />10.00% <br />Total = <br />$455,507.45 <br />TOTAL O & P = <br />$715,930.92 <br />CONTRACT AMOUNT (direct+ O & P) _ <br />$5,271,005.46 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): <br />Engineering work and /or contract/bid preparation: <br />Reclamation management and /or administration: <br />all <br />4.61% <br />3.58% <br />Total <br />Total <br />1 11 <br />$242,993.35 <br />$188,702.00 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $1,147,626.27 <br />TOTAL BOND AMOUNT (direct + indirect) = S5,702,700.81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.