My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-05_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2013-04-05_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:12 PM
Creation date
4/5/2013 12:46:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
4/5/2013
Doc Name
Cost Estimate
From
Susan Burgmaier
To
Marcia Talvitie
Type & Sequence
RN6
Email Name
SLB
SB1
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 43 of 149 <br />SCRAPER TEAM WORK <br />Task description: Replace topsoil on 106.8 ac Lloyd/Benson property Zone 6 <br />Site: New Horizon Mine Permit Action: Permit Renewal 6 Permit /Job #: C1981008 <br />PROJECT IDENTIFICATION <br />Task #: 30D State: Colorado Abbreviation: None <br />Date: 12/18/2012 County: Montrose Filename: C008 -30d <br />User: SLB <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />HOURLY EQUIPMENT <br />- Scraper: Cat 631G <br />- Dozer: Cat D9T - 9SU <br />COSTShift basis: 1 per day <br />iption <br />Support Equipment -Load Area: <br />NA <br />-Dump Area: <br />NA <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />Cost Breakdown: Scraner Work Team Sunnort Eauinment Maintenance Eauinment <br />Total work team cost /hour: $1,564.64 <br />MATERIAL OUANTITIES <br />Initial volume: 732,292 CCY Swell factor: 1.100 <br />Loose volume: 805,521 LCY <br />Source of estimated volume: Map 2.05.4 -6, 21" A /B, 30" sub <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,100 lbs /LCY <br />Material description: User Provided <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 38.86 LCY <br />Scraner Bowl (volume) Basis <br />Struck Volume: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost /hour: <br />$72.80 <br />$69.88 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$163.63 <br />$142.13 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$30.02 <br />$37.41 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$266.45 <br />$249.42 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />4 <br />2 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$1,564.64 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost /hour: $1,564.64 <br />MATERIAL OUANTITIES <br />Initial volume: 732,292 CCY Swell factor: 1.100 <br />Loose volume: 805,521 LCY <br />Source of estimated volume: Map 2.05.4 -6, 21" A /B, 30" sub <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,100 lbs /LCY <br />Material description: User Provided <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 38.86 LCY <br />Scraner Bowl (volume) Basis <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Sofiivare <br />
The URL can be used to link to this page
Your browser does not support the video tag.