Laserfiche WebLink
Page 39 of 149 <br />SCRAPER TEAM WORK <br />Task description: Replace topsoil on 31.68 ac Morgan property Zone 3 <br />Site: New Horizon Mine Permit Action: Permit Renewal 6 Permit /Job #: C1981008 <br />PROJECT IDENTIFICATION <br />Task #: 30B State: Colorado Abbreviation: None <br />Date: 12/18/2012 County: Montrose Filename: C008 -30b <br />User: SLB <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />HOURLY EQUIPMENT <br />- Scraper: Cat 631G <br />- Dozer: Cat D9T - 9SU <br />COSTShift basis: 1 per day <br />iption <br />Support Equipment -Load Area: <br />NA <br />-Dump Area: <br />NA <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />Cost Breakdown: Scraner Work Team Sunnort Eauinment Maintenance Eauinment <br />Total work team cost /hour: $1,564.64 <br />MATERIAL OUANTITIES <br />Initial volume: 370,550 CCY Swell factor: 1.100 <br />Loose volume: 407,605 LCY <br />Source of estimated volume: Map 2.05.4 -6, 54 "A /B, 33" sub <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,100 lbs /LCY <br />Material description: User Provided <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 38.86 LCY <br />Scraner Bowl (volume) Basis <br />Struck Volume: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost /hour: <br />$72.80 <br />$69.88 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$163.63 <br />$142.13 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$30.02 <br />$37.41 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$266.45 <br />$249.42 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />4 <br />2 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$1,564.64 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost /hour: $1,564.64 <br />MATERIAL OUANTITIES <br />Initial volume: 370,550 CCY Swell factor: 1.100 <br />Loose volume: 407,605 LCY <br />Source of estimated volume: Map 2.05.4 -6, 54 "A /B, 33" sub <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,100 lbs /LCY <br />Material description: User Provided <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 38.86 LCY <br />Scraner Bowl (volume) Basis <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Sofiivare <br />