My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-05_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2013-04-05_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:12 PM
Creation date
4/5/2013 12:46:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
4/5/2013
Doc Name
Cost Estimate
From
Susan Burgmaier
To
Marcia Talvitie
Type & Sequence
RN6
Email Name
SLB
SB1
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOTOR GRADER WORK <br />Task description: <br />Site: New Horizon Mine <br />soilinterface <br />Permit Action: Permit Renewal 6 <br />PROJECT IDENTIFICATION <br />Task #: 010 State: <br />Date: 12/18/2012 County: <br />User: SLB <br />Agency or organization name <br />Colorado <br />Montrose <br />DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 14M <br />Ripper Attachment: Multi -Shank Ripper <br />Cost Breakdown: <br />Ownership Cost /Hour: <br />Operating Cost/Hour: <br />Ripper Operating Cost /Hour: <br />Operator Cost/Hour: <br />Total Unit Cost /Hour: <br />Total Fleet Cost /Hour: <br />Page 26 of 149 <br />Permit /Job #: C1981008 <br />Abbreviation: None <br />Filename: C008 -010 <br />Horsepower: 259 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />$41.37 <br />Utilization % <br />NA <br />$67.74 <br />100 <br />$3.30 <br />100 <br />$27.55 <br />NA <br />$139.95 <br />5139.95 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: 20.00 <br />Source of estimated acreage: Map 2.05.3(3) -2 and Division Aerial Photographs <br />HOURLY PRODUCTION <br />acres <br />Average Grader Speed: <br />1.50 <br />mph <br />Selected Application: <br />Ripping (0 -3 mph) - 1.50 <br />Selected Blade Angle: <br />-1 <br />degrees <br />Effective Blade Length: <br />0.00 <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />feet <br />Net grading or ripping width per pass: <br />8.50 <br />feet <br />Unadjusted Hourly Unit Production: <br />1.5455 <br />acres/hour <br />Job Condition Correction Factors <br />Site Altitude: 5700 <br />feet <br />Source <br />Altitude Adj : 1.00 <br />(CAT HB) <br />Job Efficiency: 0.90 <br />(1sh /d, fay.) <br />Net Correction: 0.9000 multiplier <br />Adjusted Hourly Unit Production: <br />1.3909 <br />acres /Hour <br />Adjusted Hourly Fleet Production: <br />1.3909 <br />acres /Hour <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Total job time: <br />14.38 Hours <br />Unit cost: $100.62 per acre <br />Total job cost: <br />S2,012.00 <br />CIRCES Cost Estimating Sofiivare <br />
The URL can be used to link to this page
Your browser does not support the video tag.