My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-05_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2013-04-05_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:12 PM
Creation date
4/5/2013 12:46:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
4/5/2013
Doc Name
Cost Estimate
From
Susan Burgmaier
To
Marcia Talvitie
Type & Sequence
RN6
Email Name
SLB
SB1
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: Push <br />Site: New Horizon Mine <br />BULLDOZER WORK <br />Lll Block 2 into pit <br />Permit Action: Permit Renewal 6 <br />PROJECT IDENTIFICATION <br />Task #: 02B State <br />Date: 12/18/2012 County <br />User: SLB <br />Colorado <br />Montrose <br />Permit /Job #: C1981008 <br />Abbreviation: None <br />Filename: C008 -02B <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />HOURLY EQL <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />IPMENT COST <br />Cat D9T - 9U <br />405 <br />Universal <br />NA <br />1 per day <br />(CRG) <br />Loose volume: 72,247 LCY <br />Source of estimated volume: WFC Fence Diagram, 3,348' long Cut 96 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />110 feet <br />1,227.1 LCY/hr <br />Materials consistency description: Rock, avg. ripped or blasted 0.7 <br />Average push gradient: -20% <br />Average site altitude: 5,700 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Utilization % <br />Ownership Cost /Hour: <br />$69.88 <br />NA <br />Operating Cost/Hour: <br />$142.13 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost /Hour: $249.42 <br />Total Fleet Cost /Hour: $498.84 <br />MATERIAL QUANTITIES <br />Initial Volume: 72,247 <br />Swell factor: 1.000 <br />Loose volume: 72,247 LCY <br />Source of estimated volume: WFC Fence Diagram, 3,348' long Cut 96 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />110 feet <br />1,227.1 LCY/hr <br />Materials consistency description: Rock, avg. ripped or blasted 0.7 <br />Average push gradient: -20% <br />Average site altitude: 5,700 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.