My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-04_REPORT - C1996084
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996084
>
2013-04-04_REPORT - C1996084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:08 PM
Creation date
4/5/2013 11:04:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
REPORT
Doc Date
4/4/2013
Doc Name
4th Quarter 2012 Excess Spoil Fill Report
From
New Elk Coal Company
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
LDS
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FILL PLACEMENT <br />COVER MATERIAL <br />Spoil Fill #8, <br />December 21, 2012 <br />Page 2 <br />Fill placement has been completed in accordance with the approved plan. No additional fill placement is <br />anticipated. <br />Final fill configuration has been established and topsoil material has been placed on the excess spoil -fill. <br />The area was mulched and seeded in the fourth quarter of 2003. Soil was placed and spread on the upper <br />most surface of the fill in May of 2004. During the second quarter of 2005, areas disturbed by maintenance <br />of the armored down - drains were seeded using certified weed free straw and the approved rangeland seed <br />mix. The construction access road east of the east down -drain was hand mulched and seeded during August <br />of 2006. <br />STRUCTURAL INTEGRITY <br />The excess spoil fill facility was examined for signs of failure and instability such as tension cracks, ground <br />movement, springs and seeps, and standing water. No indications of potential instability or adverse <br />conditions were observed during this inspection. <br />DOCUMENTATION AND OTHER OBSERVATIONS <br />Early winter conditions prevail with limited snow cover on this north facing slope. Overall, the site is in <br />good condition with some minor rills found on the reclaimed slopes. These need to be watched but <br />indications are that erosion has stopped as vegetation starts to in -fill the rills. Operator has hydromulched <br />repaired areas, and should consider rock or straw check dams to further stabilize conditions. <br />CERTIFICATION <br />This inspection was conducted by Ronald G. Thompson, a qualified professional and MSHA certified <br />inspector of earth and rockfill embankments and impoundments, under the direction of Mr. Charles <br />McGlothlin, a registered professional engineer licensed in the State of Colorado. <br />This is to certify, to the best of my knowledge and belief, that Fill No. 8 construction and placement, as <br />noted since the previous certification and as determined during this inspection and discussions with mine <br />personnel, is in accordance with designs as proposed by CTL Thompson in their report dated April 27 and <br />amended July 27, 2001 and as approved by the Division of Minerals and Geology. <br />Ronald G. Thompson <br />Inspector <br />C harles Mc lothlin <br />Professional Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.