My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-04_REPORT - C1981012
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981012
>
2013-04-04_REPORT - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:08 PM
Creation date
4/5/2013 11:04:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REPORT
Doc Date
4/4/2013
Doc Name
4th Quarter 2012 Waste Bank Inspection Report
From
New Elk Coal Company
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
LDS
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New Elk Mine <br />QUARTERLY COAL WASTE BANK INSPECTION REPORT <br />CDMR Rules 4.09.1(11) and 4.10.2(2) <br />Mine: NEW ELK <br />Waste Bank MSHA ID. No.: Development Waste Disposal Area #2 <br />Inspection Period: Fourth Quarter 2012 <br />Inspection Date: 12/20/2012 <br />General Description or Reference to Site Plan: <br />The Development Waste Disposal Area is located south of State Highway 12 and east of <br />the main facility Access Road. It is adjacent to and north of the Middle Fork of the <br />Purgatoire River. The area is used for disposal of waste rock from underground mining and <br />and disposal of sediment from ponds and ditches located within the mine permit area. The <br />Facility was recently permited and approved by DRMS as part of the mine reopening. <br />Activity During Inspection: <br />Refuse placement has been completed and the operator has shaped all but the east end <br />of the pile surface to final grade. The operator is evaluating alternative uses for the area <br />that may result in a permit revision rather than establishing cover and revegetation of the <br />area. <br />Drainage: (Discussion of springs. seeps, overland and channel flow, underdrain construction and /or <br />discharge, integrity of 100 -year 24 -hour drainage structures, and evidence of positive drainage). <br />Positive drainage is maintained on the surface of the DWP. No evidence of springs nor seeps <br />was observed. <br />Observation of Fill Construction: (Description of material, compaction, lift thicknesses, slopes, <br />and construction methods). <br />Coarse to fine - grained development waste rock has been placed and compacted acording <br />to approved plans. Compaction testing was done by CTL- Thompson on May 28, 2012 <br />demonstrating that refuse placement has been conducted in accordance with plan <br />requirements. No refuse placement has occurred since the May compaction testing. <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.