My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-03_HYDROLOGY - C1984065 (2)
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1984065
>
2013-04-03_HYDROLOGY - C1984065 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:06 PM
Creation date
4/4/2013 9:30:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
HYDROLOGY
Doc Date
4/3/2013
Doc Name
1st Quarter 2013 Impoundment Yearly Inspection
From
J.E. Stover & Associates, Inc
To
DRMS
Permit Index Doc Type
Sediment Pond Inspections
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IMPOUNDMENT CAPACITIES - ACRE FEET <br />Water <br />Sediment <br />Total <br />Sediment Pond <br />6.34 <br />0.90 <br />7.24 <br />C.B. MINERALS COMPANY, LLC <br />COAL RIDGE NO. 1 MINE <br />IMPOUNDMENT YEARLY INSPECTION <br />In accordance with Rule 4.05.9(14), all impoundments shall be inspected at least yearly <br />to determine if the impoundment has been maintained as designed, and in accordance <br />with the approved plan and the applicable regulations. This yearly inspection is for the <br />impoundment located at the Coal Ridge No. 1 Mine. <br />On February 27, 2013, I performed the required yearly inspection. I, J. E. Stover, have <br />a wide variety experience in the design and construction of earth fill embankments. <br />Nothing was observed during the inspection that would indicate the pond has a <br />potential for failure. There were not any instability, structural weakness or other <br />hazardous conditions. There are no required monitoring procedures or instrumentation <br />other than quarterly and yearly inspections. There are no aspects which might affect <br />stability. The pond was covered with about 12 inches of snow. The snow had melted <br />from most of the south facing slopes. <br />The impoundment has the following capacity: <br />Note: <br />Capacities are derived from Figure 4.3 -6, Issue No. 1 dated 7/27/00 and <br />verification of sediment level relative to primary spillway. <br />To the best of my knowledge and belief, the impoundment has been maintained as <br />designed and in accordancgogirirmproved plan and applicable regulations. <br />54.0c-, <br />• <br />JOS. Stover,. 7 Date <br />Color'' "q* Engineer <br />Registra v.elt230 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.