Laserfiche WebLink
TABLE 2 <br />AREA OF DISTURBANCE ASSOCIATED WITH ACCESS ROAD <br />AND DRILL SITE CONSTRUCTION: <br />Temporary <br />Road Acres of <br />Length Road Pad Pad New <br />Site (14' wide) Acres Size Acres Disturbance <br />SST - 1 1,375 0.44 100'X200' 0.46 0.90 <br />SST -2 i 540 0.17 100'X200' 0.46 0.63 <br />SST -3 1,725 0.55 100'X200' 0.46 1.01 <br />SST -4 5,615 1.80 100'X200' 0.46 2.26 <br />SST -5 1,925 0.62 100'X200' 0.46 1.08 <br />SST -6 3,995 1.28 100'X200' 0.46 1.74 <br />SST -7 3,085 0.99 100'X200' 0.46 1.45 <br />SST -8 3,045 0.98 100'X200' 0.46 1.44 <br />SST -9 5,055 1.62 100'X200' 0.46 2.08 <br />SST -10 2,770 0.89 100'X200' 0.46 1.35 <br />SP -1 0 0 80'X100' 0.18 0.18 <br />SP -2 0 0 80'X100' 0.18 0.18 <br />TOTALS 14.32 <br />16 <br />