Laserfiche WebLink
EXHIBIT H : Reclamation Costs <br /> First Plan : <br /> The affected lands will be flooded and covered by tailings of <br /> the Mayflower Tailing Pond in approximately twenty years . <br /> $63000 Scrape and stockpile topsoil (or utilize elsewhere) . <br /> $23000 Seed, fertilize . <br /> $83,000 Total Cost 1977-1979 <br /> $1503,000 - 175 ,000 Rock Face Tailings , Spot Topsoiling, <br /> Planting, Seeding, Fertilizing & mulching. <br /> Alternate Plan : <br /> $63000 Scrape and stockpile topsoil (or utilize elsewhere) . <br /> $63000 Replace topsoil and landscape <br /> $2 ,500 Seed, Fertilize , Mulch <br /> $23000 Plant trees and shrubs <br /> $16,500 <br />