Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 330 Page 5 of 8 <br />Task description: <br />Site: Bowie No. 2 Mine <br />PROJECT IDENTIFICATION <br />BULLDOZER WORK <br />Vent Hole B13 Drill Pad <br />Permit Action: Minor Revision 134 <br />Task #: 335 State: Colorado <br />Date: 3/19/2013 County: Delta <br />User: BFB <br />Agency or organization name: DRMS <br />Permit/Job #: C1996083 <br />Abbreviation: None <br />Filename: C083 -335 <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Horsepower: 405 <br />Blade Type: Semi - Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost /Hour: <br />$69.88 <br />NA <br />Operating Cost/Hour: <br />$142.13 <br />100 <br />Ripper op. Cost /Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $249.42 <br />Total Fleet Cost/Hour: $249.42 <br />MATERIAL OUANTITIES <br />Initial Volume: 1,613 <br />Swell factor: 1.125 <br />Loose volume: 1,815 LCY <br />Source of estimated volume: <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: _ <br />Unadjusted hourly <br />production: <br />Materials consistency description: <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />100 feet <br />1,243.2 LCY /hr <br />Consolidated stockpile 1.0 <br />Average push gradient: 20% <br />Average site altitude: 7,725 feet <br />Material weight: 2,550 Ibs /LCY <br />Weight description: Earth - Dry packed <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.000 (CAT HB) <br />CIRCES Cost Estimating Software <br />