Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 330 Page 3 of 8 <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.830 <br />(1 SHIFT /DAY) <br />0.800 <br />(FND -RF) <br />0.545 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.2152 <br />Adjusted unit production: <br />Adjusted fleet production <br />JOB TIME AND COST <br />267.54 LCY /hr <br />267.54 LCY /hr <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.932/LCY <br />Total job time: 10.54 Hours <br />Total job cost: $2,628.36 <br />CIRCES Cost Estimating Software <br />