Laserfiche WebLink
2.05.3 <br />Bowie -2 MR -123 approved six gob vent holes to be drilled in 2011. They <br />are GVB -B11A, 131113, 1312A, 131213, B12C & 613A. MR -124 approved <br />two additional holes to be drilled in 2011. They are GVB -1311C and B12D. <br />Bowie -2 TR -73 approved ten gob vent holes and three exploration holes. <br />They are GVB -B12E, GVB -B13B, GVB -B13C, GVB- B13D,GVB -B13E, <br />GVB -B14A, GVB -B14B, GVB -B14C, GVB -B14D, GVB -B14E, SS -6 <br />SS -7 and 2012 -1. <br />Bow -2 MR -133 approved the installation of four utility holes to be installed <br />north of the large ventilation fan above the D -Seam portals. MR -133 also <br />approved the installation of GVB -13F. <br />Bow -2 MR -134 approved the installation of an emergency vent hole into <br />the B13 tailgate bleeder entry. Due to technical difficulties this vent hole <br />was not installed. The drill pad for the emergency hole was constructed. <br />Bow -2 MR -135 approved the installation of an emergency gob vent hole <br />for the B13 panel (GVB- B13C -1). <br />MR -135 2.05-49- 04/13 <br />