Laserfiche WebLink
TAB 20 <br />TABLE OF CONTENTS <br />LIST OF FIGURES <br />Figure No. Page <br />20 -1 Postmining Topography Typical Mass Balance 9 <br />LIST OF TABLES <br />Table No. Page <br />20 -1 Postmining Landform Mass Balance (North Area) 7 <br />20 -1A Postmining Material Mass Balance — II -W South Area 8 <br />20 -2 Postmine Drainage Channel Summary 13 <br />20 -3 Guide to Retardance Class Selection 15 <br />20 -4 Turf Reinforcement Mat Performance Guide 17 <br />TR- 79 i Revised 12/12 <br />Page <br />Disturbed Area <br />1 <br />Backfilling and Grading Procedures <br />2 <br />Postmining Topography <br />5 <br />General <br />5 <br />Volume Calculations ( Premining Topography) <br />6 <br />Premining Material Volume <br />6 <br />Virgin Overburden Material Volume <br />6 <br />Total In -Place Coal Volume <br />6 <br />Recoverable Coal Volume <br />6 <br />Premining Overburden Volume <br />6 <br />Total Pit Spoil Volume <br />10 <br />Volume Calculations ( Postmining Topography) <br />10 <br />Postmining Drainage Channel Design <br />11 <br />Postmining Drainage Channels in the South Area <br />14 <br />Vegetated Channel Designs <br />14 <br />Rock Riprap Channel Design <br />16 <br />Turf Reinforcement Mat Channel Deign <br />16 <br />Permanent Structures <br />18 <br />References Cited <br />19 <br />LIST OF FIGURES <br />Figure No. Page <br />20 -1 Postmining Topography Typical Mass Balance 9 <br />LIST OF TABLES <br />Table No. Page <br />20 -1 Postmining Landform Mass Balance (North Area) 7 <br />20 -1A Postmining Material Mass Balance — II -W South Area 8 <br />20 -2 Postmine Drainage Channel Summary 13 <br />20 -3 Guide to Retardance Class Selection 15 <br />20 -4 Turf Reinforcement Mat Performance Guide 17 <br />TR- 79 i Revised 12/12 <br />