Laserfiche WebLink
amec <br />2.0 SUMMARY OF EARTHWORK CONSTRUCTION <br />Earthworks activities associated with the LOB Liner Extension included the following: <br />• Site excavation and reshaping per the drawings; <br />• BF placement and compaction, and preparation of BF surface for GCL deployment; <br />• acceptance of the installed GCL prior to geomembrane deployment; <br />• 80 -mil LLDPE single sided texture deployment and acceptance <br />• BF placement above the geomembrane layer; and <br />• re- placement of SF to finish grade per the drawings <br />Ames generally used the following equipment during construction: <br />• Caterpillar D6 LGP Dozer; <br />• Caterpillar 988 Loader; <br />• John Deere 544 Loader; <br />• Caterpillar 777 Haul Trucks; <br />• Caterpillar 740 Haul Trucks; <br />• Caterpillar CS563 Compactor; <br />• Caterpillar 312 Trackhoe ; <br />• Caterpillar 330 Trackhoe <br />• Caterpillar 385 Trackhoe; <br />• John Deere 850 Trackhoe; <br />• Bobcat Skid Steer Loader; and <br />• Tandem -axle Water Truck <br />Table 2 presents a summary of the weather during the period of October 10 through October <br />13 2011 for the construction activities. <br />5 <br />