My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-03-29_HYDROLOGY - M1980244
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1980244
>
2013-03-29_HYDROLOGY - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:18:56 PM
Creation date
4/2/2013 7:09:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
HYDROLOGY
Doc Date
3/29/2013
Doc Name
Response to Adequacy Issues for As- Built Cert. Rpt. for LOB Liner Expansion.
From
CC&V
To
DRMS
Permit Index Doc Type
Hydrology Report
Email Name
PSH
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 26, 2013 <br />Mr. Timm Comer <br />Manager Environmental Resources <br />Cripple Creek & Victor Mining Company <br />P.O. Box 191 <br />Victo, Colorado 80860 <br />Re: Cripple Creek & Victor Mining, Co. Cresson Project, M -1980- <br />244 Acceptance of As -Built Certification Report for LOB Liner <br />Expansion <br />Dear Mr. Comer: <br />AMEC Earth & Environmental, Inc <br />2000 South Colorado Blvd <br />Suite 2 -1000 <br />Denver, Colorado 80222 <br />Tel. (303) 935 -6505 <br />Fax (303) 935 -6575 <br />www.amec com <br />ame <br />Project 74201125K <br />AMEC Environment and Infrastructure (AMEC) has prepared this letter in response to <br />comments from the State of Colorado Division of Reclamation, Mining and Safety in their letter <br />dated March 20, 2013 regarding the above referenced project. Copies of the revised pages of <br />the report referenced are include with this letter for replacement within the submitted report. <br />The state comments appear in italics followed by our responses. <br />1. In section 2.0 Summary of Earthwork Construction, the Operator states Table 2 presents a <br />summary of the weather during the period of October 10 through October 12 2011 for the <br />construction activities. Table 2 presents a summary of the weather during the period of <br />October 10 through October 13 2011. Please explain this discrepancy and correct the <br />report as needed. <br />Section 2.0 Summary of Earthwork Construction has been revised to correctly match the <br />dates presented on Table 2. Sheet 5 of the above referenced report has been included with <br />this letter for page replacement within the submitted report. <br />2. In section 2.4 Bedding Fill (above installed geomembrane), the Operator refers twice to <br />Drain Cover Fill (DCF). The Division believes the Operator intended to refer to Bedding Fill <br />(BF). Please review and correct the section as needed. <br />The Division is correct; the Operator did intend to refer to Bedding Fill (BF), not Drain Cover <br />Fill (DCF). Sheet 7 of the above referenced report has been included with this letter for <br />page replacement within the submitted report. <br />Please do not hesitate to contact us at your earliest convenience if there are further questions or <br />concerns. <br />
The URL can be used to link to this page
Your browser does not support the video tag.