My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-03-28_REVISION - C1981028
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2013-03-28_REVISION - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:18:54 PM
Creation date
3/29/2013 10:24:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
REVISION
Doc Date
3/28/2013
Doc Name
Adequacy Review #1 Response
From
Coors Energy Company
To
DRMS
Type & Sequence
TR44
Email Name
BFB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENERGY COMPANY <br />March 27, 2013 <br />Brock Bowles, Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />RE: Technical Revision No. 44 <br />Permit No. C- 1981 -028 [Keenesburg Mine] <br />Adequacy Review #1 — Response <br />Dear Mr. Bowles: <br />If you have any additional questions, please contact me. <br />Sincerely, <br />,Pam 2J4 <br />Danny Kipp <br />Chief Reclamation Specialist <br />Enclosures: Revised page 56 <br />Coors Energy Company (CEC) is submitting a Response addressing the comments received in <br />your March 25, 2013 Adequacy Review #1 for Technical Revision No. 44. For clarity the <br />comments are reiterated with the response following. <br />1. Please speck in the permit document the timeframe for conducting the sampling and analysis <br />(e.g., spring & fall). <br />2. Please specify in the permit document a statement that quarterly sampling will resume at least <br />one year prior to final bond release. <br />CEC has prepared a revised page 56 that incorporated comments 1 and 2 in paragraph three it <br />reads as follows. (The subsurface water wells are monitored semi - annually April and <br />September. Quarterly sampling will resume at least one year prior to final bond release. The six (6) <br />wells presently monitored are:) <br />
The URL can be used to link to this page
Your browser does not support the video tag.