Laserfiche WebLink
RESPONSE <br />TC will comply with this requirement. <br />Rule 2.03.6 - Right of Entry and Operation Information <br />(1) Each application shall contain a complete and detailed legal description of the proposed <br />permit boundary, a description of the documents upon which the applicant bases his or her legal rigrht to enter and <br />begin surface coal mining operations in the permit area. and a statement as to whether that right is the subiect of <br />pending litigation. The description shall identify those documents by type and date of execution, identify the <br />specific lands to which the document pertains, and explain the legal rights claimed by the applicant. <br />UMO-TSIMS 01 <br />Federal Lands <br />TC will not enter Federal coal or Federal surface lands without first obtaining a required mining plan approval from <br />the Secretary of Interior as provided for in the Colorado Cooperative Agreement at 30 CFR 906.30. TC's contact to <br />obtain the required mining plan approval will be OSM's Western Regional Coordinating Center, in Denver. <br />TC PERMIT BOUNDARY - LEGAL DESCRIPTION <br />T4N, R86W <br />Section 7 NEA (Lots 1 & 2 and part of Lot 3) <br />Section 8 N/2 (Lots I — 4) <br />Section 9 N/2 (Lots 2 — 5) <br />T5N, R86W <br />Section 1 <br />Section 2 <br />Section 3 <br />Section 4 <br />Section 5 <br />Section 6 <br />Section 7 <br />Section 8 <br />Section 9 <br />Section 10 <br />Section 11 <br />Section 12 <br />Section 13 <br />Section 14 <br />Section 15 <br />Section 16 <br />Section 17 <br />Section 18 <br />Section 19 <br />Section 20 <br />Section 21 <br />W/2 SW /4 <br />S /2, NE /4 <br />S /2SE /4, SW /4 <br />S /2, NW /4, S/2 NE /4, NW /4 NE /4 <br />ALL <br />E/2 NE /4, SE /4, SW /4NE /4 <br />S /2, NEA, E /2NW /4 <br />ALL <br />ALL <br />ALL <br />ALL <br />SW /4 SW /4 <br />W/2 W/2 <br />ALL <br />ALL <br />ALL <br />ALL <br />ALL <br />ALL <br />ALL <br />ALL <br />TR13 -82 2.03 -22 02/28/13 <br />