Laserfiche WebLink
Month <br />Percentage of <br />Annual Production' <br />Aggregate <br />Production' (tons) <br />Water Retained <br />in Product (ac -ft) <br />Water Used for <br />Dust Control (ac -ft) <br />Total Operational <br />Consumptive Use (ac -ft) <br />Apr -13 <br />8.8% <br />21,120 <br />0.31 <br />0.35 <br />0.66 <br />May -13 <br />9.6% <br />23,016 <br />0.34 <br />0.38 <br />0.72 <br />Jun -13 <br />9.6% <br />23,016 <br />0.34 <br />0.38 <br />0.72 <br />Jul -13 <br />9.6% <br />23,016 <br />0.34 <br />0.38 <br />0.72 <br />Aug -13 <br />9.6% <br />23,016 <br />0.34 <br />0.38 <br />0.72 <br />Sep -13 <br />9.6% <br />23,016 <br />0.34 <br />0.38 <br />0.72 <br />Oct -13 <br />8.8% <br />21,120 <br />0.31 <br />0.35 <br />0.66 <br />Nov -13 <br />6.9% <br />16,536 <br />0.24 <br />0.28 <br />0.52 <br />Dec -13 <br />6.9% <br />16,536 <br />0.24 <br />0.28 <br />0.52 <br />Jan -14 <br />6.9% <br />16,536 <br />0.24 <br />0.28 <br />0.52 <br />Feb -14 <br />6.9% <br />16,536 <br />0.24 <br />0.28 <br />0.52 <br />Mar -14 <br />6.9% <br />16,536 <br />0.24 <br />0.28 <br />0.52 <br />Total <br />100.0% <br />240,000 <br />3.53 <br />4.00 <br />7.53 <br />Table No. 2 <br />SerFer Pit <br />Connell Resources <br />Operation <br />'Annual and monthly aggregate production is estimated based on discussions with Connell Resources <br />2 Water retained in product is applying a 2% moisture content as the mining at the site is in a de- watered condition. <br />3 Monthly dust control uses the same monthly percentage as sand and gravel production from the site. All water used for dust control is assumed 100% consumed. <br />° Total operational consumptive use is combination of water retained in product and dust control. <br />