Laserfiche WebLink
Total acres <br />Occidental Oil Shale, Inc. <br />Total acres <br />M- 1977 -424 <br />Total acres <br />Logan Wash <br />Total acres <br />Garfield <br />backfilled: <br />,,, 3 •7 <br />seeded w/ <br />/ //. Si <br />w /topsoil <br />6.3 <br />mulched w/ <br />/ //, S <br />approved mix: <br />replaced: <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />j //- g <br />fertilized w/ <br />6, 3 <br />replacement <br />(,v <br />rate (tons): <br />apvd fertilizer: <br />depth (in.): <br />Seed <br />'3.4 ,t1)c;ts; <br />Fertilizer <br />Th .4c .t- <br />Mulch <br />p1,474 ,i,Yrt_ <br />application <br />��-ic <br />application <br />• 4 � - L <br />application <br />8���, � <br />method: <br />t.lz� <br />method: <br />method: <br />Permittee Name: <br />Occidental Oil Shale, Inc. <br />Permit Number: <br />M- 1977 -424 <br />Operation Name: <br />Logan Wash <br />County: <br />Garfield <br />Annual Fee Due: <br />$633.00 <br />Anniversary Date: <br />March 28, 2013 <br />Permit Acreage: <br />108.55 <br />Current Bond Amt: <br />$570,428.00 <br />SK <br />pr . <br />f <br />112 Annual Report <br />8. Number of acres that were newly affected during the current report year.M Mi 2 8 2 01 3 <br />9. Number of acres that were reclaimed during the current report year. division of Reclamation„ <br />$ S afet y <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />1 <br /><"1 <br />t 1 <br />Page 2 of 3 <br />According to C.R.S. 34 -32.5 -116 or 34 -32 -1 16, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). Ci S) NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />5. Does the mine operate more than 180 days per year <br />If `NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? Eli NO <br />b) approval for INTERMITTENT OPERATION? YES NO <br />7. Number of acres currently affected (mining + incomplete and or unrele GEWED /S, / <br />YES (1T0) <br />Ai:Yr IN cdcq-t -pc -f <br />