Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />FIELD REPORT <br />Project: Pond 16 -Area Project No.: 08 -8099 Date: 09/29/11 <br />Remediation Time: 3.0 <br />Location: Seneca IIW Mine Report No.: 10 Mileage: 74 <br />Client: Peabody Energy Engr. /Tech: JS <br />Work Performed: <br />As requested, we visited the project site on this date and conducted compaction test No.'s 48 through 53 on the <br />material being placed for Pond 16A fill. <br />The excavation contractors, Seneca Mine, were placing and compacting on site borrow material in the south third <br />of Pond 16A for pond backfill. In addition, crews were in the process of cutting in the PM -2 drainage channel <br />southwest of the shrub plot. <br />Remarks: <br />The material tested generally met the project specifications for compaction. <br />Please refer to the attached sheet for the results of today's testing. <br />Verbal Discussions: <br />Jim Rolando of Seneca Mine was aware of today's test results. <br />