2013-02-25_PERMIT FILE - C1982057 (6)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982057
>
2013-02-25_PERMIT FILE - C1982057 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:13:30 PM
Creation date
3/28/2013 10:58:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Permit File
Doc Date
2/25/2013
Doc Name
Pond 016 Area Slide Remediation Plan
Section_Exhibit Name
Tab 20 Attachment 20-D
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POND 016 SLIDE AREA CONSTRUCTION SUMMARY <br />The Pond 016 Slide Area remediation activities were conducted during the 2011 and 2012 <br />construction seasons and were based on the proposed design package. The actual locations <br />of some components were field fit, but the overall design criteria were adhered to. In 2012 it <br />was decided to wait until 2013 to place topsoil and seed the area to ensure that the area was <br />stabile. <br />There were a number of factors involved with stabilizing the area: <br />• A portion of permanent Road J/K was relocated <br />• Pond 016 slide material was removed and the cut slope stabilized <br />• Shrub Plot slump was regraded and material excavated to increase stabilization <br />• Pond 016A was backfilled with the material removed from the unstable areas <br />• Permanent Channel PM -2 was relocated and extended through the Pond 016A area <br />REMEDIATION ACTIVITIES <br />Relocation of Roads J/K <br />A portion of the J and K roads was relocated through the slide areas once the remediation <br />trench and the permanent channels were constructed. The roads do not exactly match the <br />proposed design locations but were field fit to take advantage of the surface topography. The <br />road location is shown on Exhibit 20 -2, Postmining Topography and Drainage. <br />These construction criteria that SCC adhered to included: <br />�• Materials placed in approximate 12 inch lifts <br />• Moisture/Density ( "Proctor ") curves for each separate type of fill material were <br />developed prior to commencement of placement and compaction, and the information <br />was available on site at all times <br />' • Compaction achieved a minimum of 95% MDD (See attached field reports in the <br />Construction Documentation) <br />A sheepsfoot roller was used to achieved the required level of compaction <br />On the approved design, there were three (3) culverts associated with Roads J/K. The final <br />configuration resulted in Culvert J -2 one (1) 60" culvert installed even though only a 30" <br />culvert is required (see attached Culvert J2A Design 1 Ovr /24hr); Culvert J -7 (24" installed) <br />being moved to take advantage of the underdrain ditch; Culvert Kl was eliminated due to <br />final topography configuration. <br />Pond 016 Slide Stabilization <br />The slope was excavated back into competent material. A trench was excavated at the toe of <br />the slope to collect the water and convey it along the trench to a ditch that will discharge to <br />Pond 016. The trench bottom will be approximately ten (10) feet wide with a six (6) inch <br />perforated pipe placed along the bottom and covered with a minimum of one (1) foot of 4" <br />minus gravel and covered with material excavated from the slide area. The surface above the <br />covered trench was configured to provide drainage from the area above the road and is <br />conveyed through Culvert J -7 (24" installed) under the road and discharging into the same <br />TR -79 20 -D.1 10/12 <br />