Laserfiche WebLink
CT 61-0091-2 2 <br /> EXHIBIT I Relocation of S.H. 91, for <br /> STATE bEPARTMENT OF hiGHWAYS Mayflower TaPondond <br /> JACK KINSTLINGER EXECUTIVE DIRECTOR <br /> STATE OF COLORADO <br /> DIVISION OF HIGHWAYS 1"'7'�17- COLORADO STATE PATROL <br /> E N HAASE COL. C. WAYNE KEITH, <br /> CHIEF ENGINEER 55_ CHIEF <br /> 4201 EAST ARKANSAS AVENUE • DENVER. COLORADO 80222 • (303) 757.9011 <br /> May 20, 1977 <br /> H-E Lowdermilk Co. RECEIVED <br /> P. O. Box 1318 <br /> Englewood, CO 80110 i�Y `� 7 �� <br /> Gentlemen: RECLAN", ( ECN Sr CT�vN <br /> This is confirming notice, for record, that on May 19, 1977, you were awarded <br /> the contract for the construction of Project CT 61-0091-22, relocation of S.H. 91 <br /> for Mayflower Tailings Pond, on the basis of the bid as submitted. <br /> At the Award Conference held on May 19, 1977, at 2:1 0 p.m. , the following people <br /> were present: Messrs. H. Lowdermilk, R. Lowdermilk, R. De La Castro, Cox, Frandsen, <br /> Goff, Godfrey, Rutz, and Clevenger. <br /> The work will be started about June 6, 1977, and the allowable contract time <br /> will commence on June 6, 1977, as per the Special Provisions. However, no work <br /> will be started until receipt by the Division of Highways of the fully executed <br /> contract and bond. <br /> A Preconstruction Conference will be held on May 31 , 1977, at 1:00 p.m. , <br /> at the Resident Engineer's Office in Frisco, Colorado. <br /> Mr. W. W. Goff is the Resident Engineer on this project. <br /> Very truly yours, <br /> E. N. HAASE <br /> CHIEF ENGINEER <br /> BY <br /> R.' L. leveng-r <br /> ! Staff Construction �gineer <br /> RLC:sr <br /> Attachment: Material Requirements <br /> cc: R. E. Heathcote - 1 G. W. Fritts - 1 <br /> R. A. Frandsen - 3 S. K. Brown - 1 <br /> R. E. Milleson - 1 B. A. Brakey - 1 <br /> L. D. Godfrey - 1 M. Safford - 1 <br /> G. G. Berthod - 1 W. E. Tucker - 1 <br /> T. Rutz - 1 D. L. Vernon/J. W. Kasenga - 1 <br /> Reproduction - 1 <br />