My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-03-25_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2013-03-25_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:18:48 PM
Creation date
3/25/2013 12:45:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
3/25/2013
Doc Name
Cost Estimate (Emailed)
From
DRMS
To
Tony Tennyson
Type & Sequence
SL6
Email Name
JRS
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br />Task description: Finish Grade East Pit <br />Site: Colowvo Coal Mine <br />Permit Action: Partial Phase I Bond <br />Release SL -06 Permit/Job #: C1981019 <br />PROJECT IDENTIFICATION <br />Task #: 50S State <br />Date: 3/25/2013 County <br />User: JRS <br />Colorado <br />Moffat <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D1 1R - 11U <br />Horsepower: <br />850 <br />Blade Type: <br />Universal <br />Attachment: <br />1 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />NA <br />Abbreviation: None <br />Filename: C019 -50S <br />Total unit Cost/Hour: $476.80 <br />Total Fleet Cost/Hour: $1,907.19 <br />MATERIAL OUANTITIES <br />Initial Volume: 62,766 <br />Swell factor: 1.000 <br />Loose volume: 62,766 LCY <br />Source of estimated volume <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />100 feet <br />2,870.3 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient <br />Average site altitude: <br />Material weight <br />0% <br />7,600 feet <br />2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$143.02 <br />NA <br />Operating Cost/Hour: <br />$280.92 <br />100 <br />Ripper op. Cost/Hour: <br />$15.45 <br />100 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $476.80 <br />Total Fleet Cost/Hour: $1,907.19 <br />MATERIAL OUANTITIES <br />Initial Volume: 62,766 <br />Swell factor: 1.000 <br />Loose volume: 62,766 LCY <br />Source of estimated volume <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />100 feet <br />2,870.3 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient <br />Average site altitude: <br />Material weight <br />0% <br />7,600 feet <br />2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.