Laserfiche WebLink
"' WESTERN FUELS - COLORADO, LLC <br />• <br />NEW HORIZON MINE <br />19 March 2013 <br />Ms Marcia L. Talvitie, P.E. <br />Colorado Division of Reclamation, Mining and Safety <br />691 CR 233, Suite A -2 <br />Durango, CO 81301 <br />Dear Ms Talvitie: <br />Please find enclosed the referenced report for the 1 quarter of 2013. The enclosure <br />includes the report for the New Horizon North Pond 001A. I have sent a copy to your <br />Denver office. It should be noted that Pond 001A construction was completed in <br />December 2012, but the As -Built document for the permit is still pending approval from <br />DRMS. If you have any questions, please call. <br />Sincerely, <br />RE: New Horizon North- 1 QUARTER 2013 SEDIMENT POND <br />INSPECTION REPORT , FOR PERMIT C- 2010 -089 <br />Ross L. Gubka, P.E. <br />Chief Engineer <br />F: \ENG \DATA \WORD \POND - BANKS \NHN PND1ST QT 13 <br />-�'i FQU.1 , PP(.:F TUN IT7 4F tRPM1.1r:vr . 1r07,i J,if L i R <br />A Tlitli,rone Encr'tz1 ' ".,rAuv <br />r/9 <br />.DOCdoc <br />NEW HORIZON MINE <br />P.O. BOX 628 <br />NUCLA, CO 81424 <br />PHONE; 970 - 864 -2165 <br />FAX: 970 - 864 -2168 <br />