Laserfiche WebLink
East Taylor Pond <br />3110 C.Y. <br />August /September 2012 <br />Prospect Pond <br />3010 C.Y. <br />September 2012 <br />West Taylor Pond <br />400 C.Y. <br />September 2012 <br />Colowyo Coal Company <br />2012 Annual Reclamation and Hydrology Report <br />GENERAL DISCUSSION <br />CDPS Impoundments — During calendar year 2012, the twelve CDPS impoundments <br />were inspected on a quarterly basis. Please refer to Exhibit 1 A for location of the twelve <br />impoundments. Routine maintenance was performed when necessary during the year. <br />None of the impoundments displayed any structural weakness or otherwise hazardous <br />conditions. Six other non -CDPS impoundments were inspected on a quarterly basis as <br />per guidelines. None of these impoundments displayed any structural weakness or <br />otherwise hazardous conditions. <br />Table 1. Summary of material removed from CPDS impoundments in 2012. <br />AMOUNT OF <br />POND CLEANED OUT MATERIAL REMOVED TIME OF REMOVAL <br />Small Impoundments /Livestock Water Tanks — During 2012, five livestock water tanks <br />were inspected during the third quarter. Livestock water tanks are being inspected on an <br />annual basis. The impoundments did not display any signs of structural weakness or <br />otherwise hazardous conditions. <br />