Laserfiche WebLink
March 7,2013 C-1983-059/Terror Creek Loadout JRS <br /> GENERAL MINE PLAN COMPLANCE: <br /> -The Terror Creek Loadout is a loadout only. Operations at the site include processing coal (sizing coal) and <br /> loading trains. The site was operating at the time of the inspection and will only be operational when an order for <br /> coal is received. The loadout was processing lump, stoker and coal fines at the time of the inspections. There <br /> were no problems noted with the coal processing operations and they are consistent with what is approved in the <br /> permit. <br /> ROADS—Rule 4.03 Construction 4.03.1(3)/4.03.2(3)Drainage 4.03.1(4)/4.03.2(4) Surfacing and <br /> Maintenance4.03.1(5) and(6)/4.03.2(5) and(6)Reclamation 4.03.1(7)/4.03.2(7): <br /> -The haul road from the loadout entrance to the truck scale is a paved road. This road was well maintained and <br /> stable. There were no problems noted with the road or the road embankments. The remaining haul road,from the <br /> scale to the truck dump and back to the paved portion of the road,is a dirt road. This road was wet and muddy due <br /> to the melting snow but remains stable and well maintained and no problems were noted. <br /> SUPPORT FACILITIES - Rule 4.04: <br /> -The entire facilities area was wet and muddy from the melting snow. The area was still stable and in good <br /> condition. <br /> -The fuel island area was in good condition at the time of the inspection. There was no sign of any spilled fuel. <br /> -The loadout structure was stable at the time of the inspection. <br /> -The coal crushing and stacking facility was operational at the time of the inspection. There was a small stockpile <br /> of raw coal by the truck dump. The lump coal pile was basically gone.the stoker coal piles was approximately 10 <br /> feet high (small for the site,historically)and the coal fines pile was large. <br /> DOCUMENTS RECEIVED:None <br /> This concludes the 7 March 2013 complete inspection report for the Terror Creek Loadout. <br /> Number of Partial Inspection this Fiscal Year: 6 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 3 of 5 <br />