Laserfiche WebLink
<br />22 <br />Page of <br />March 20, 2013 <br /> <br />2) Additional info as committed to in the permit: <br /> <br />EFCI indicated that vegetation sampling in 2006 and 2010 on the reclaimed areas indicate that a re- <br />evaluation of the reclamation sauccess standards is warranted. <br /> <br />EFCI conducted grading of portions of the mine entrance road from the eastern end of Pond 5 to the <br />Newlin Creek Mine gate, recut waterbars across the access road and on the light use road to the RDA, <br />Cleaned portions of ditches that showed accumulation of sediment, and cleared sediment fan from the <br />outfall of the southern culvert outlet in Pond 5. <br /> <br />The 2010 Interim monitoring report was submitted to the Division on June 27, 2011. <br /> <br />Trenches on the east and west fence lines were enlarged to minimize trespass access across the Load <br />out site. <br /> <br />Submittal of the 2011 Annual Reclamation Report fulfills the requirements of Rule 2.04.13. <br /> <br />Sincerely, <br /> <br /> <br />Janet Binns <br />Environmental Protection Specialist III <br />(303) 866-3567 ext. 8107 <br /> <br />