Laserfiche WebLink
<br />22 <br />Page of <br />March 20, 2013 <br /> <br />2) Additional info as committed to in the permit: <br /> <br />EFCI contracted with a third party, IME, to conduct interim vegetation sampling in accordance with <br />permit commitments. The results of the 2010 sampling study were not submitted to the Division at <br />the same time as the 2010 ARR. <br /> <br />EFCI indicated that vegetation sampling in 2006 and 2010 on the reclaimed areas indicate that a re- <br />evaluation of the reclamation sauccess standards is warranted. <br /> <br />EFCI reported that in 2010, EFCI erected localized fencing aroundselected tree and shrub transplants <br />that were exhibiting stress or damage from wildlife browsing. <br /> <br />Other maintenance items conducted in 2010 noted in the 2010 ARR included occasional grading of <br />the mine entrance road (County Road No. 92) from Pond 5 to the western end at the Newlin Creek <br />Mine gate, reshaping of waterbars across the light use road to the RDA, cleaning of sediment from <br />road side ditch along light use road to RDA, grading Monarch fan road and ditches from North to <br />south where needed. <br /> <br />Submittal of the 2010 Annual Reclamation Report fulfills the requirements of Rule 2.04.13. <br /> <br />Please contact me if you have any questions regarding this review. <br /> <br />Sincerely, <br /> <br /> <br />Janet Binns <br />Environmental Protection Specialist III <br />(303) 866-3567 ext. 8107 <br />