My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-03-19_REVISION - C1996083 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2013-03-19_REVISION - C1996083 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:18:41 PM
Creation date
3/19/2013 3:06:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
3/19/2013
Doc Name
Cost Estimate (Emailed)
From
DRMS
To
Jim Stover
Type & Sequence
MR134
Email Name
BFB
SB1
SLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Reclaim Bleeder Vent Hole B13 <br />Site: Bowie No. 2 Mine <br />PROJECT IDENTIFICATION <br />Permit Action: Minor Revision <br />134 Permit /Job #: C1996083 <br />Task #: 330 State: Colorado <br />Date: 3/19/2013 County: Delta <br />User: BFB <br />Agency or organization name: DBMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C083 -330 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />331 <br />333 <br />335 <br />337 <br />Regrade Vent Hole B13 Drill Pad <br />DOZER <br />1 <br />1 <br />1 <br />1 <br />10.54 <br />$2,628.36 <br />$23,729.33 <br />$1,487.17 <br />$1,391.40 <br />Plug and Seal 24" Bleeder Vent Hole <br />BOREHOLE <br />48.00 <br />Re- topsoil Vent Hole B13 Drill Pad <br />DOZER <br />5.96 <br />Reseed Bleeder Vent Boreholes B13 <br />REVEGE <br />0.20 <br />SUBTOTALS: <br />64.7 <br />$29,236.26 <br />INDIRECT COSTS <br />$590.57 <br />OVERHEAD AND PROFIT: <br />$306.98 <br />Liability insurance: <br />2.02% <br />Performance bond: <br />1.05% <br />Job superintendent: <br />10.00 hrs <br />Profit: <br />10.00% <br />Total — <br />$590.57 <br />Total — <br />$306.98 <br />Total — <br />$654.10 <br />Total — <br />$2,923.63 <br />TOTAL O & P — <br />$4,475.28 <br />CONTRACT AMOUNT (direct + O & P) — <br />$33,711.54 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and /or contract/bid preparation: <br />4.00% <br />Total — <br />$1,348.46 <br />Reclamation management and /or administration: <br />3.13% <br />$1,055.17 <br />CONTINGENCY: <br />0.00 <br />Total — <br />$0.00 <br />TOTAL INDIRECT COST — <br />$6,878.91 <br />TOTAL BOND AMOUNT (direct + indirect) = <br />$36,115.17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.