Laserfiche WebLink
Truck Travel (Haul & Return) Time: <br />maintained 3.0 <br />Haul Route: <br />Road Condition: Firm, smooth, rolling, dirt/lt. surfaced, watered, <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Travel <br />Time <br />min <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />0.50 <br />3503 <br />2.790 <br />min <br />1 <br />9000.00 <br />2.50 <br />3.00 <br />5.50 <br />1266 <br />7.251 <br />Haul Time <br />Return Route: <br />7.251 <br />minutes <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />Loading Tool unit <br />1 <br />9000.00 <br />- 2.50 <br />3.00 <br />0.50 <br />3503 <br />2.790 <br />CIRCES Cost Estimating Software <br />Return Time: 2.790 <br />minutes <br />Total Truck Cycle Time: 13.521 <br />minutes <br />Loading Tool unit <br />Production <br />4,603.46 <br />LCY/Hour Adjusted for job efficiency: <br />3,820.87 LCY/Hour <br />Truck Unit Production <br />776.15 <br />LCY/Hour Adjusted for job efficiency: <br />644.20 LCY/Hour <br />Optimal No. of Trucks: <br />6 <br />Truck(s) Selected Number of Trucks: <br />8 Truck(s) <br />Adjusted hourly truck team production: 5,153.63 <br />LCY/Hour <br />Adjusted single truck/loader team production: 3,820.87 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 7,641.74 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />2 <br />Team(s) Total job time: 5,114.70 <br />Hours <br />Unit cost: <br />$1.329 <br />/LCY Total job cost: $51,945,352.41 <br />CIRCES Cost Estimating Software <br />