My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-03-18_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2013-03-18_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:15:12 PM
Creation date
3/19/2013 9:48:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
3/18/2013
Doc Name
Cost Estimate (Emailed)
From
DRMS
To
Tony Tennyson
Type & Sequence
RN6
Email Name
JRS
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br />Task description: Doze South Taylor Pit Highwall <br />Site: Colowyo Coal Mine Permit Action: Permit Renewal 06 <br />PROJECT IDENTIFICATION <br />Task #: 010 State <br />Date: 3/18/2013 County <br />User: JRS <br />Colorado <br />Moffat <br />Agency or organization name: DRMS <br />HOURLY EQt <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />JIPMENT COST <br />Cat D1 1R - 11U <br />850 <br />Universal <br />1 -shank ripper <br />1 per day <br />(CRG) <br />Permit/Job #: C1981019 <br />Abbreviation: None <br />Filename: C019 -010 <br />Total unit Cost/Hour: $476.80 <br />Total Fleet Cost/Hour: $1,907.19 <br />MATERIAL OUANTITIES <br />Initial Volume: 279,105 <br />Swell factor: 1.000 <br />Loose volume: 279,105 LCY <br />Source of estimated volume: <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />370 feet <br />873.7 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: -10% <br />Average site altitude: 7,600 feet <br />Material weight: 2,572 lbs/LCY <br />Weight description: User Provided <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$143.02 <br />NA <br />Operating Cost/Hour: <br />$280.92 <br />100 <br />Ripper op. Cost/Hour: <br />$15.45 <br />100 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $476.80 <br />Total Fleet Cost/Hour: $1,907.19 <br />MATERIAL OUANTITIES <br />Initial Volume: 279,105 <br />Swell factor: 1.000 <br />Loose volume: 279,105 LCY <br />Source of estimated volume: <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />370 feet <br />873.7 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: -10% <br />Average site altitude: 7,600 feet <br />Material weight: 2,572 lbs/LCY <br />Weight description: User Provided <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.