Laserfiche WebLink
BULLDOZER WORK <br />Task description: Doze South Taylor Pit Highwall <br />Site: Colowyo Coal Mine Permit Action: Permit Renewal 06 <br />PROJECT IDENTIFICATION <br />Task #: 010 State <br />Date: 3/18/2013 County <br />User: JRS <br />Colorado <br />Moffat <br />Agency or organization name: DRMS <br />HOURLY EQt <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />JIPMENT COST <br />Cat D1 1R - 11U <br />850 <br />Universal <br />1 -shank ripper <br />1 per day <br />(CRG) <br />Permit/Job #: C1981019 <br />Abbreviation: None <br />Filename: C019 -010 <br />Total unit Cost/Hour: $476.80 <br />Total Fleet Cost/Hour: $1,907.19 <br />MATERIAL OUANTITIES <br />Initial Volume: 279,105 <br />Swell factor: 1.000 <br />Loose volume: 279,105 LCY <br />Source of estimated volume: <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />370 feet <br />873.7 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: -10% <br />Average site altitude: 7,600 feet <br />Material weight: 2,572 lbs/LCY <br />Weight description: User Provided <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$143.02 <br />NA <br />Operating Cost/Hour: <br />$280.92 <br />100 <br />Ripper op. Cost/Hour: <br />$15.45 <br />100 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $476.80 <br />Total Fleet Cost/Hour: $1,907.19 <br />MATERIAL OUANTITIES <br />Initial Volume: 279,105 <br />Swell factor: 1.000 <br />Loose volume: 279,105 LCY <br />Source of estimated volume: <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />370 feet <br />873.7 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: -10% <br />Average site altitude: 7,600 feet <br />Material weight: 2,572 lbs/LCY <br />Weight description: User Provided <br />CIRCES Cost Estimating Software <br />