Laserfiche WebLink
Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Source <br />0.900 <br />(AB.AVG.) <br />1.100 <br />(CAT HB) <br />1.000 <br />(GEN. ) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />1.000 <br />(DOZ -OC) <br />1.426 <br />(CAT HB) <br />0.930 <br />(CAT HB) <br />0.894 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.9742 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />881.94 LCY/hr <br />3527.76 LCY/hr <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.541/LCY <br />Total job time: <br />Total job cost: <br />141.43 Hours <br />$269,732.48 <br />CIRCES Cost Estimating Software <br />