Laserfiche WebLink
a. <br />OI <br />U_ <br />24" STEEL <br />FROM BARGE <br />(RE -USE EXISTING) <br />C7 <br />BARGE BLOCK, Z <br />FIELD LOCATE in <br />(REF. DETAIL x <br />w <br />DWG. 5 -6 -2001) <br />W <br />FLOW — — <br />1 BARGE BLOCK <br />vuN vltw <br />0 1 2 4 6 <br />Scale in Feet <br />BARGE BLOCK <br />30" DR 11 FLANGE ADAPTER <br />AND BACKING RING <br />30" DR 11 <br />HDPE(NEW) <br />FLOW <br />TO EAST BRANCH <br />RESERVOIR <br />�I <br />FLOW <br />24" BUTTERFLY <br />N0 <br />VALVE <br />DR RATING <br />INSTALL PLYWOOD <br />11 <br />— COVER WHEN <br />24" DR 26 HDPE X 50' LONG. <br />NOT IS USE <br />INSTALL TEMPORARILY <br />STA 33 +00 <br />CLEANING/FLUSHING <br />Z7DURING <br />OPERATIONS. <br />STA 49 +00 <br />FLOW <br />24" FLANGE ADAPTER <br />AND BACKING RING <br />BARGE BLOCK A <br />SECTION 2003 <br />0 1 2 4 8 <br />Scab in Feet <br />GROUND <br />SURFACE <br />NOTE: 12" HDPE FLANGE <br />PLACE BOLLARD (ONE ON ADAPTER AND <br />EACH SIDE) OF CLEANOUT BACKING RING <br />(NOT SHOWN). <br />12" HDPE <br />PIPE (FIELD FIT) <br />30" X 12" HDPE _ <br />30" HOPE PIPE REDUCING TEE <br />1" NPT PLUG <br />12" 150 L.B. <br />BLIND FLANGE FF <br />W/ 1" NPT HOLE GROUND <br />SURFACE <br />191AIIIa7211 <br />w <br />Q 30" FLANGE ADAPTER <br />t AND BACKING RING <br />r w (TYP 4) <br />U) a <br />2 BARGE PIPELINE CLEANOUT <br />-_— DtTAIlS <br />0 2 4 6 6 <br />Scale In Feet <br />�i <br />6' <br />6" SCH 40 A53 <br />PIPE (FILL W! <br />CONCRETE) <br />GROUND <br />�— SURFACE <br />I ' <br />3' <br />MIN. 6" CONCRETE <br />ALL AROUND <br />MAKE 22 EACH <br />3 BOLLARD <br />DETAILS <br />0 1 2 4 6 <br />Scale in Feet <br />CLEANOUT TABLE <br />N0 <br />LOCATION <br />DR RATING <br />STA 9 +00 <br />11 <br />STA 17 +00 <br />11 <br />STA 25 +00 <br />11 <br />STA 33 +00 <br />13.5 <br />STA 41 +00 <br />13.5 <br />STA 49 +00 <br />13.5 <br />NOTE: <br />FIELD LOCATE <br />_ <br />" <br />S <br />N0 <br />o..e <br />n + +�d +3+ <br />rucear <br />cm er <br />sa++ <br />aanrars <br />issworalaenery <br />"This drawing together with any and all additions. <br />corrections, changes and alterations thereof is the <br />w <br />DR— eo <br />xerwe,ce <br />2013 BARGE RELOCATION PROJECT <br />Gllmax Molybdenum henderson Mlll <br />Z <br />property o/ Climox Molybdenum Company and is <br />0 <br />e Amax o y enum <br />Parshall, CO <br />o <br />0 <br />furnished on me express condition that it snob <br />w <br />A Freepot3- McMoRan Company <br />PIPELINE <br />01!13 <br />a rn <br />not be reproduced, copied, IM f, or disposed of <br />Z <br />DCM <br />As Noted <br />j <br />w <br />0 <br />directly or indirectly, nor used for any other <br />W <br />3'ao S. s,•eecr <br />CLEANOUTS AND <br />01!13 <br />DRANANG NO. <br />g <br />Q <br />purpose than for which it is specifcoll furnished <br />Y <br />without the prior written consent of said Climax <br />w <br />W <br />W. W. WHEELER- ENa�ew000, co eo1 1 ❑ -3aos <br />- -- - -- --- -- - - - -" , <br />s A9sOC1ATE 9, INC 3a3-761 -4130 <br />- <br />- <br />SMM <br />�pgr <br />5-6-2003 <br />A <br />x <br />Molybdenum Company. <br />yb y <br />w.e.ra..o"msEnpmw . x cnx3a3-761 -2aa2 <br />BARGE BLOCK <br />.. <br />QA <br />