My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-03-14_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
2013-03-14_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:15:00 PM
Creation date
3/15/2013 7:02:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
REVISION
Doc Date
3/14/2013
Doc Name
TR Request
From
Battle Mountain Resources, Inc
To
DRMS
Type & Sequence
TR33
Email Name
WHE
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEMS REQUIRING ACTION BY OWNER TO IMPROVE THE SAFETY OF THE DAM <br />MAINTENANCE • MINOR REPAIR • MONITORING <br />❑ (1) PROVIDE ADDITIONAL EROSION PROTECTION: <br />❑ (2) CLEAR BRUSH FROM: <br />❑ (3) INITIATE RODENT CONTROL PROGRAM AND PROPERLY BACKFILL EXISTING HOLES: <br />❑ (4) GRADE CREST TO A UNIFORM ELEVATION WITH DRAINAGE TO THE UPSTREAM SLOPE: <br />❑ (5) PROVIDE SURFACE DRAINAGE FOR: <br />❑ (6) MONITOR: <br />❑ (7) OTHER: <br />❑ (8) OTHER: <br />❑ (9) OTHER: <br />ENGINEERING • EMPLOY AN ENGINEER EXPERIENCED IN DESIGN AND CONSTRUCTION OF DAMS TO: <br />(Plans and specifications to be improved by CDRMS prior to construction.) <br />❑ (10) PREPARE PLANS AND SPECIFICATIONS FOR REHABILITATION OF THE DAM <br />❑ (11) PREPARE AS -BUILT DRAWINGS OF: <br />❑ (12) PERFORM A GEOTECHNICAL INVESTIGATION TO EVALUATE THE STABILITY OF THE DAM: <br />❑ (13) PERFORM A HYDROLOGIC STUDY TO DETERMINE REQUIRED SIZE OF FLOOD BYPASS /SPILLWAY: <br />❑ (14) PREPARE PLANS AND SPECIFICATIONS FOR AN ADEQUATE SPILLWAY <br />❑ (15) SET UP OR IMPROVE MONITORING SYSTEM: <br />❑ (16) OTHER: <br />❑ (17) OTHER: <br />Recommended schedule for upgrades /implementation of recommendations (please prioritize and note importance of each): <br />• Photographs • Attachments <br />ENGINEER'S INSTRUCTION: Instructed owner on the safety concerns with the structure and how to monitor and inspect the dam and <br />appurtenant works in the interim period between the regulatory annual inspections. ❑ Yes ❑ No <br />Comment: <br />Professional Engineer's Signature: Date: <br />Reviewed by: Date: <br />Owner /Owner's Representative <br />DAM NAME: San Luis Tailing Dam <br />TAILING DAM INSPECTION FORM <br />Page 3 of 4 <br />DATE OF REPORT: <br />
The URL can be used to link to this page
Your browser does not support the video tag.