Laserfiche WebLink
Appendix A <br />Coal Mine Waste Disposal Area - <br />- - - salvage Volumes----- -- - <br />Area *Topsoil <br />-- - - _Topsoil_ -i - -- <br />� Ft. <br />- - -Acres _ _Depth <br />_ _ _CY Coverfill <br />- -- -- 1.2 4 453 <br />�- - - - -- -- �- - - '- <br />- <br />Initial 0PFIoot Bench _ 3.91 1.2 7,550 <br />Second 50 Foot Bench 7.7 1.2 14,90 <br />Third 50 Foot Bench 5.8 12 <br />_ _11,229 <br />.2 5,614 <br />Fourth 50 Foot Bench 2.9 L-2­5­6-1- <br />Top of Pile 2.3 1.21 4,453 <br />Gob Pile #4 <br />7.4 <br />0.58i 6,9241 <br />Gob Pile #1 <br />2.7 <br />0.51 <br />2,178 <br />Gob #2 West Expansion <br />1.8, <br />1.2 <br />3,485; <br />Gob #2 Expansion -TR76 <br />6.1 <br />1.2 <br />11,8101 <br />(Fill in Draw Between Pile #2 and <br />#4) <br />Totals <br />42.901 <br />72,603 <br />- <br />Volumes <br />Reclamation <br />Area <br />Topsoil <br />Topsoil <br />From <br />Cover (Regd) <br />_ <br />Acres <br />Depth Ft. <br />I CY <br />Stockpile <br />CY <br />_ <br />Initial 50 Foot Bench <br />3.9 <br />0.9 <br />5,663 <br />5,663 <br />19,505 <br />Second 50 Foot Bench <br />5.1 <br />0.9 <br />7,347, 7,347 <br />25,307 <br />- <br />Third 50 Foot Bench 5.2 <br />0.9 <br />7,594; 7,5941 <br />26,157! <br />- - <br />25,557 <br />Fourth OeFoot Bench 5.1 <br />0 7,42Oµ <br />Top of P .8 <br />- - <br />0.9 <br />- - <br />- - <br />9,917 <br />- 9,917' <br />- <br />- -- 34,159 <br />- <br />Coverfill Pile - 2.3 <br />Gob Pile # 4 10.2 <br />0.9 <br />0.9 <br />3,3401 3,3401 <br />14,810 14,810 <br />n a <br />- 51,014 <br />- <br />Gob Pile #1 y 1.1 <br />- - <br />0.9 <br />- <br />1 597 <br />, <br />1,597' - __ 5,501 <br />Gob #2 West Expansion 0.9 <br />- - - -- <br />0.9, <br />-- <br />0.9 <br />- - <br />1307, 1 3071 <br />- 11,0 -- 4,501 <br />11,035 11,035 38,010, <br />Gob #2 Ex ansion -TR76 <br />p <br />7.6 <br />-� <br />I _ <br />- - - - - - -- <br />Totals 48.23 66,6901 229,711 <br />- - - - -- <br />SURVCAD Calculated Volumes <br />In- Place; _ TOTAL: <br />1 TOTAL: <br />Volume Salvaged <br />CY <br />Tons <br />CY <br />COVERFILL PILE <br />28,432 <br />298,213 <br />Cover <br />'Topsoil <br />447,320 <br />Cover <br />TOPSOIL PILES <br />50,326 <br />72,521 <br />1.0.8,782 <br />Topsoil _ <br />BORROW AREA <br />179,281 <br />BORROW AREA TOPSOIL <br />6,900 <br />- - - <br />Cut Slo - --R -72 -- <br />Pe R P 'on ) - - - -- <br />Ex ansi <br />- <br />- - <br />-- - - -- - -- - <br />- - - <br />' <br />- -- - - <br />TOPSOIL T <br />3,485 <br />1 <br />COVERFILL <br />Cut Slope (T_R-76 Expansion) ** <br />- <br />60,900 <br />+ <br />TOPSOIL <br />- <br />- <br />11,810 <br />COVERFILL <br />29,600 <br />-�- - - <br />- -- - -- <br />-- -- - <br />- <br />NOTES, <br />* UNIFORM TOPSOIL DEPTH ASSUMED M ORDER TO MATCH QUANTITY CALCULATED <br />** VALUES CALCULATED AS PART OF PLANNED CUT SURFACE, MATERIAL WILL LIKEL Y BE USED TO <br />RECLAIM GOB PILE #2 AND WILL NOT BE PLACED IN A STOCKPILE , <br />TR -76 App. A 11/12 <br />