Laserfiche WebLink
Yoast Mine; C1994-082 Midterm Review No. 4 (MT4) <br />MOTOR GRADER WORK <br />Task description: Regrade Diversion 14A <br />Site: Yoast Mine Permit Action: MT4 <br />PROJECT IDENTIFICATION <br />Task #: 034 State: Colorado <br />Date: 3/11/2013 County: Routt <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 14M <br />Ripper Attachment: Multi -Shank Ripper <br />Cost Breakdown <br />Page 23 of 92 <br />Permit/Job #: C1994082 <br />Abbreviation: None <br />Filename: C082 -034 <br />Horsepower: 259 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: 1.10 <br />Source of estimated acreage: Division Estimate <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />Selected Application: <br />Selected Blade Angle: <br />Effective Blade Length: <br />Width of blade overlap per pass: <br />Net grading or ripping width per pass: <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />1.25 <br />mph <br />Production Deration - 1.25 <br />0 <br />degrees <br />14.00 <br />Utilization % <br />Ownership Cost/Hour: <br />$41.37 <br />12.00 <br />NA <br />Operating Cost/Hour: <br />$67.74 <br />100 <br />Ripper Operating Cost/Hour: <br />$0.83 <br />25 <br />Operator Cost/Hour: <br />$27.55 <br />NA <br />Total Unit Cost/Hour: <br />$137.48 <br />Total Fleet Cost/Hour: <br />$139.95 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: 1.10 <br />Source of estimated acreage: Division Estimate <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />Selected Application: <br />Selected Blade Angle: <br />Effective Blade Length: <br />Width of blade overlap per pass: <br />Net grading or ripping width per pass: <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />1.25 <br />mph <br />Production Deration - 1.25 <br />0 <br />degrees <br />14.00 <br />feet <br />2.00 <br />feet <br />12.00 <br />feet <br />1.8182 <br />acres/hour <br />Source <br />Altitude Adj : 1.00 (CAT HB) <br />Job Efficiency: 0.90 (1sh/d, fay.) <br />Net Correction: 0.9000 multiplier <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Unit cost: $84.02 per acre <br />Site Altitude: 7200 feet <br />1.6364 <br />1.6364 <br />Total job time: <br />Total job cost: <br />acres <br />acres/Hour <br />acres/Hour <br />0.67 Hours <br />$92.00 <br />CIRCES Cost Estimating Software <br />