Laserfiche WebLink
Yoast Mine; C1994-082 Midterm Review No. 4 (MT4) Page 17 of 92 <br />Task description <br />Site: Yoast Mine <br />BULLDOZER WORK <br />ade Pond 011 <br />Permit Action: MT4 <br />PROJECT IDENTIFICATION <br />Task #: 031 State <br />Date: 3/11/2013 County <br />User: JLE <br />Colorado <br />Routt <br />Agency or organization name: DRMS <br />HOURLY EOt <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />JIPMENT COST <br />Cat D9T - 9SU <br />405 <br />Semi - Universal <br />3 -shank ripper <br />1 per day <br />(CRG) <br />Permit/Job #: C1994082 <br />Abbreviation: None <br />Filename: C082 -031 <br />Total unit Cost/Hour: $259.86 <br />Total Fleet Cost/Hour: $259.86 <br />MATERIAL OUANTITIES <br />Initial Volume: 8,389 <br />Swell factor: 1.165 <br />Loose volume: 9,773 LCY <br />Source of estimated volume <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Division of Reclamation, Mining & Safi <br />Cat Handbook <br />Average push distance: 150 feet <br />Unadjusted hourly 910.5 LCY/hr <br />production: <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: 0% <br />Average site altitude: 7,000 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$78.33 <br />NA <br />Operating Cost/Hour: <br />$142.13 <br />100 <br />Ripper op. Cost/Hour: <br />$1.99 <br />25 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $259.86 <br />Total Fleet Cost/Hour: $259.86 <br />MATERIAL OUANTITIES <br />Initial Volume: 8,389 <br />Swell factor: 1.165 <br />Loose volume: 9,773 LCY <br />Source of estimated volume <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Division of Reclamation, Mining & Safi <br />Cat Handbook <br />Average push distance: 150 feet <br />Unadjusted hourly 910.5 LCY/hr <br />production: <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: 0% <br />Average site altitude: 7,000 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />CIRCES Cost Estimating Software <br />