Laserfiche WebLink
Yoast Mine; C1994-082 Midterm Review No. 4 (MT4) Page 8 of 92 <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.900 <br />(CAT HB)) <br />1.000 <br />(GEN. ) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />0.903 <br />(CAT HB) <br />0.930 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.2985 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />465.66 LCY/hr <br />931.32 LCY/hr <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.955/LCY <br />Total job time: <br />Total job cost: <br />0.41 Hours <br />$367.29 <br />CIRCES Cost Estimating Software <br />