My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-03-13_REVISION - M1982131
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1982131
>
2013-03-13_REVISION - M1982131
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:14:55 PM
Creation date
3/13/2013 3:23:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982131
IBM Index Class Name
REVISION
Doc Date
3/13/2013
Doc Name
TR-02 SUBMITTAL
From
APPLEGATE GROUP
To
DRMS
Email Name
PSH
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Peter Hays <br />March 12, 2013 <br />Page 2 of 2 <br />the Operators plan to dedicate this piece of property to the City of Greeley for use as access to <br />the Island Grove Pond. In the interest of complying with the board findings the upper lift of <br />material has already been removed. Photos documenting the current state of the fill placed in the <br />pit are included as attachments to this document. <br />The Operator feels that the lower lift of material placed in the pit is clean and free of putrescible <br />materials. The Operator plans to process the material in the lower lift by systemically removing <br />material placed in a work area, extracting all putrescible materials that may be encountered, <br />replacing clean material in the same work area, and moving on to the next until the entire lower <br />lift has been processed in this manner. The Operator will provide compaction testing on the <br />material as it is replaced. <br />At this time the Operator feels that they can process the remaining material within one year. We <br />will provide quarterly communications to the DRMS documenting the progress made in each <br />preceding quarter. <br />Once all material in this area has been removed or sorted the Operator will submit final <br />documentation of the work completed along with a signed statement that all putrescible materials <br />have been removed from the fill placed in the pit in violation of the Amended Mining Permit. <br />Sincerely, <br />Applegate Group, Inc. <br />Carrie Herbolsheimer, PE <br />Project Engineer <br />CRH/ta <br />Enclosures <br />cc: Randy Bucklen, Bucklen Equipment Company <br />AG File No. 07 -148 <br />N: \07148 Bucklen Annual Report\Disciplines (Technical)\Mine Planning\Resolution of Fill Placed \TR \TR coverletter.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.