My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-03-11_REVISION - C1981019 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2013-03-11_REVISION - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:14:46 PM
Creation date
3/13/2013 2:43:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
3/11/2013
Doc Name
OSM Section 106 Consultation letter to SHPO
From
OSM
To
History Colorado
Type & Sequence
PR3
Email Name
JHB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Topsoil stripping results of the monitoring will be included within the Year -4 monitoring report, <br />as outlined below. <br />Upon completion of the baseline evaluation, Colowyo will follow up with field investigations <br />every four years and monitor the sites listed above and other sites subsequently identified within <br />the disturbance boundary. After three consecutive evaluations (12 years), should a no effect <br />determination for impacts to these sites be determined through consultation with the Division, <br />OSM, and SHPO, the requirement to monitor these sites will no longer be required. Colowyo <br />will request in writing to discontinue monitoring from the CDRMS, OSM, and SHPO. However, <br />if project affects are identified, regular interval monitoring (every four years) will continue and <br />be re- evaluated for continued monitoring every four years. <br />Reporting <br />The results from the field evaluations (initial baseline assessment and subsequent monitoring) <br />will be compiled into detailed summary reports. The first report will include the baseline <br />assessment and HPA delineation. This report will be completed and submitted to the CDRMS as <br />soon as practical, when the field evaluation is completed. Subsequent reports will include <br />evaluations of impacts (as compared with) the original baseline assessment and will be submitted <br />to the CDRMS at the end of the construction season, but no later than December 31 of the year <br />the monitoring occurred. Colowyo will not submit reports at the end of the construction season <br />for topsoil stripping monitoring, because if a site is discovered, the unanticipated discovery <br />notifications outlined above will have already occurred and will have been documented. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.