My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-29_PERMIT FILE - C1981010
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2013-01-29_PERMIT FILE - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:30 PM
Creation date
3/13/2013 8:05:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Permit File
Doc Date
1/29/2013
Doc Name
WATER SAMPLING PROCEDURES
Section_Exhibit Name
APPENDIX Q SECTION XXXI
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
replaced or as needed. The instructions for calibration procedures are provided with the <br />meter. <br />C. Specific Conductance (SPCO) Meter. SPCO is also taken at each discharge site with a <br />portable meter. The meter is usually calibrated monthly or when repairs to the meter are <br />made or when the batteries are replaced or as needed. The instructions for calibration <br />procedures are provided with the meter. <br />D. Thermometer. Whenever water samples are taken the temperature is recorded. The <br />combination pH /SPCO meter is also used to record the temperature. Calibrations are <br />done as needed. <br />IV. Sampling Schedule <br />The monitoring schedules for the NPDES sites are presented by Table 4.8 -12 with sample loca- <br />tions shown on Map M52. The monitoring frequency is specified by NPDES permit CO- 0032115. <br />In order not to bias sampling dates, Trapper traditionally conducted surface water sampling on <br />Tuesday of each week. In accordance with the most recent NPDES permit, a monthly monitoring <br />interval has been specified. Sampling will now be conducted during the first full week of each <br />month. <br />Typically not all sample sites are active (discharging) during the scheduled sampling period. Inac- <br />tive sites may not be directly visited the first week of the month or at all due to inaccessibility <br />during inclement weather. Monthly parameters will be taken during the first week of each month. <br />Also, the parameters required on a quarterly frequency are collected during the first month of each <br />quarter. <br />Most of the drainages at Trapper discharge only under spring runoff conditions or under major <br />precipitation events. When discharges do occur during the sampling period, the complete suite of <br />parameters (list A -3 of Table 4.8 -12) is taken to insure NPDES and CDRMS sampling <br />requirements are met. Sample schedules are monitored to insure necessary samples are <br />obtained and sample frequencies are met. <br />The following parameters or conditions shall be monitored monthly during monthly sampling: <br />1) Flow <br />2) In -situ pH <br />3) In -situ SPCO <br />4) Oil and Grease. If no sheen is present, then no sample is required. If a sheen is present, then <br />a grab sample must be taken. <br />5) In -situ temperature <br />Appendix Q, Section XXXI, Part B discusses spring and seep monitoring and analysis. <br />GCR 11/12 <br />Pemut Revisions \TR- 110\APP -Q31] <br />T? �kC <br />Sc"V\' Zk: v <br />
The URL can be used to link to this page
Your browser does not support the video tag.