My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-03-08_REPORT - M1977342
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977342
>
2013-03-08_REPORT - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:14:42 PM
Creation date
3/12/2013 3:32:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
REPORT
Doc Date
3/8/2013
Doc Name
ANNUAL FEE/REPORT
From
OPERATOR
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEAK DOWN TEST OF SEEP WATER LINE <br />REV. DATE:02 /01/10 SUPERSEDES:07 /03/07 <br />STD. JOB # 698 SUPRVSR. APPROVAL: Lenny Owens <br />RECENT CHANGES TO THIS DOCUMENT S OUNDED BY ASTERISKS. <br />LAST REVIEW DATE 03/28/11 � (c f J <br />PROVIDE COPIES TO TIM HAYNES AND CURTIS BROWN UPON <br />COMPLETEION. <br />1.° Shut the Intake Valves and make sure that they do <br />not leak by - checking discharge valves for water <br />flow. <br />2. /Close discharge valves for drain line and overflow <br />line. <br />3. / drain line and overflow line and check discharge <br />valves for leaks. <br />4. l Lock all valves and read pressure gauge at the <br />discharge valves. <br />5. Lock all valves and read pressure gauges at the <br />discharge valves: <br />Drain Line Pressure <br />Overflow Line Pressure '7/ Date /Time / - -/ <br />6. Wait over 24 hours and read Pressure gauges: <br />Drain Line Pressure ir e Date /Time 9 T �� <br />Overflow Line Pressure 00 Date /Time f - <br />7. / If there isn4t a drop in pressure in the 24 hour <br />period you can remove the locks. Open the intake <br />valves first, then the discharge valves and return <br />the system back to the pond operators. <br />8. If there is a drop in pressure note the pressure drop <br />and repair the system, possible leaking pipes or <br />valves. <br />9. ,/A11 machine gaurds are in good condition, have no <br />open holes nd are properly installed. <br />10. Pickup area after PM is done. Ensure house keeping is <br />in good order. <br />- 1 - <br />Date /Time <br />q�-61z <br />
The URL can be used to link to this page
Your browser does not support the video tag.