Laserfiche WebLink
Month <br />Taylor & Gill <br />FHG Deliveries <br />(acre -feet) <br />(A) <br />Estimated <br />Recharge Ponds <br />Evaporation <br />(acre -feet) <br />(B) <br />Net <br />Recharge <br />(acre -feet) <br />(C) <br />Lagged Recharge <br />Credit Accretion <br />(acre -feet) <br />(D) <br />Return <br />Flow <br />Factor <br />( %) <br />(E) <br />Return Flow <br />Obligations <br />(acre -feet) <br />(F) <br />Net Impact to <br />Poudre River <br />(acre -feet) <br />(G) <br />Jan -13 <br />0.00 <br />0.00 <br />7.79 <br />0.41% <br />0.58 <br />7.21 <br />Feb -13 <br />0.00 <br />0.00 <br />6.34 <br />0.34% <br />0.47 <br />5.86 <br />Mar -13 <br />0.00 <br />0.00 <br />5.14 <br />0.28% <br />0.39 <br />4.74 <br />Apr -13 <br />0.00 <br />0.29 <br />-0.29 <br />4.25 <br />53.72% <br />0.00 <br />4.25 <br />May -13 <br />26.33 <br />0.38 <br />25.95 <br />8.39 <br />62.90% <br />16.56 <br />-8.17 <br />Jun -13 <br />46.77 <br />0.46 <br />46.31 <br />18.30 <br />37.92% <br />17.74 <br />0.56 <br />Jul -13 <br />49.33 <br />0.48 <br />48.86 <br />26.75 <br />40.70% <br />20.08 <br />6.67 <br />Aug -13 <br />42.50 <br />0.43 <br />42.08 <br />30.24 <br />42.92% <br />18.24 <br />12.00 <br />Sep -13 <br />27.36 <br />0.32 <br />27.05 <br />28.87 <br />47.22% <br />12.92 <br />15.95 <br />Oct -13 <br />4.11 <br />0.22 <br />3.89 <br />22.25 <br />0.04% <br />0.09 <br />22.17 <br />Nov -13 <br />0.00 <br />0.00 <br />15.21 <br />0.75% <br />1.47 <br />13.74 <br />Dec -13 <br />0.00 <br />0.00 <br />11.44 <br />0.51% <br />1.01 <br />10.43 <br />Total <br />196.41 <br />2.57 <br />193.85 <br />184.95 <br />- <br />89.55 <br />95.40 <br />Table 4 <br />Martin Marietta Materials <br />Upper Poudre Combined Sites <br />Recharge Ponds Accretions <br />2012 Deliveries = <br />140.43 acre -feet <br />Notes: <br />(A) Total average farm headgate deliveries to the recharge ponds based on HCU for portion of Taylor and Gill Ditch water sent to <br />the recharge ponds. <br />(B) Evaporation estimated based on total recharge pond surface area when diversions are being made. <br />(C) Equals (A) - (B) <br />(D) Lagging calculations were based on the following parameters: <br />Distance from stream = 2,300 ft, Transmissivity = 160,000 gpd/ft, Specific Yield = 0.2, No -flow Boundary = 6,500 ft <br />(E) Return flow factors are based on HCU analysis for the 5.75 shares of Taylor and Gill Ditch Water. <br />(F) January-March = (2012 Deliveries * (E) ), April- September = (B) *(E), October- December = (2013 Deliveries * (E)). <br />(G) Equals (D) - (F) <br />BBA <br />ater wnsu'.c.tnts B ISHOP-B ROGUE AI A SSOCIATES INC <br />