Laserfiche WebLink
Month <br />Percent of <br />Annual <br />Evaporation <br />Gross Pond <br />Evaporation <br />(inches) <br />Average <br />Precipitation <br />(inches) <br />Effective <br />Precipitation <br />70% <br />(inches) <br />Net Pond <br />Evaporation <br />(inches) <br />Total <br />Evaporative <br />Loss <br />4 acres <br />(acre-feet) <br />Lagged <br />Depletions <br />(acre -feet) <br />LAVWCD <br />Replacement <br />Water <br />Provided <br />(acre -feet) <br />Apr - 13 <br />9.0% <br />4.59 <br />1.26 <br />0.88 <br />3.71 <br />1.24 <br />1.05 <br />1.05 <br />May - 13 <br />12.0% <br />6.12 <br />1.37 <br />0.96 <br />5.16 <br />1.72 <br />1.48 <br />1.48 <br />Jun - 13 <br />14.5% <br />7.40 <br />1.65 <br />1.16 <br />6.24 <br />2.08 <br />1.82 <br />1.82 <br />Jul - 13 <br />15.0% <br />7.65 <br />2.38 <br />1.67 <br />5.98 <br />1.99 <br />1.86 <br />1.86 <br />Aug - 13 <br />13.5% <br />6.89 <br />1.34 <br />0.94 <br />5.95 <br />1.98 <br />1.87 <br />1.87 <br />Sep - 13 <br />10.0% <br />5.10 <br />0.87 <br />0.61 <br />4.49 <br />1.50 <br />1.56 <br />1.56 <br />Oct - 13 <br />7.0% <br />3.57 <br />0.44 <br />0.31 <br />3.26 <br />1.09 <br />1.21 <br />1.21 <br />Nov - 13 <br />4.0% <br />2.04 <br />0.4 <br />0.28 <br />1.76 <br />0.59 <br />0.80 <br />0.80 <br />Dec - 13 <br />3.0% <br />1.53 <br />0.4 <br />0.28 <br />1.25 <br />0.42 <br />0.58 <br />0.58 <br />Jan - 14 <br />3.0% <br />1.53 <br />0.32 <br />0.22 <br />1.31 <br />0.44 <br />0.53 <br />0.53 <br />Feb -14 <br />3.5% <br />1.79 <br />0.72 <br />0.50 <br />1.28 <br />0.43 <br />0.51 <br />0.51 <br />Mar - 14 <br />5.5% <br />2.81 <br />1.46 <br />1.02 <br />1.78 <br />0.59 <br />0.60 <br />0.60 <br />Totals <br />100% <br />51.00 <br />12.61 <br />8.83 <br />42.17 <br />14.06 <br />13.85 <br />13.85 <br />Notes: <br />(1) <br />(2) <br />EVAPORATIVE LOSSES & REPLACEMENT SCHEDULE <br />Baxter Road Pit <br />2013 Plan Year <br />(3) <br />Table 1 <br />( <br />(5) <br />(6) <br />(7) <br />(1) Equals the Monthly Distribution from SB 120. <br />(2) Based on NOAA mapping distributed based on Column (1). <br />(3) Based on climate data from Pueblo Memorial AP weather station (1981- 2010). <br />(4) Equals column (3) times 70 percent. <br />(5) Equals column (2) minus (4), adjusted for negative months. <br />(6) Equals column (5) times acreage divided by 12. <br />(7) Lagged stream depletions calculated using the State's stream depletion model (Table 2). <br />(8) Replacement water provided by 5 -year contract with the Lower Arkansas Valley Water Conservancy District for 21 ac -ft of Larkspur Ditch. <br />WATATE ER r; - <br />ST EN= <br />C r <br />OLS <br />(8) <br />Deere & Ault Consultants, Inc. 12/4/2012 2013 Baxter Pit Tables.xls <br />